LEAK TEST
Section 45 paragraph construction order NW ( BauO ) requires that any change of Madame Property drainage systems a tightness check of the existing house Connectors | carried out no later than 31.12.2015 is .In water protection areas even a deadline was scheduled to 31.12.2005 .
Newly laid sewer lines must be checked for its 1610
as tightness according to DIN EN .
In combination with a special Prüfblasen
electronic measurement acquisition via PC
facilitate the implementation and proto-
kollierung the process.
Our qualified team is under
appropriate certificates
authorized the leak test for old -
and newly laid pipes to DIN EN 1610 or
ATV M 143 remove part 6 with a final pressure test protocol.
It is possible to complete conversations ( from manhole to manhole ) , sections
a pipe to check shafts and sleeves.